The overall objective of the project is to significantly improve the reliability and efficiency of existing coal-fired power plants under flexible …
Coal pyrolysis in existing facilities. Collection and upgrading of tars and oils in existing upgrading equipment for further utilization as feedsto…
Award Number: DE-EE0007347, CXs Applied: A9, B3.6, Water Power Technologies Office, Location: VA, Office: Golden Field Office
This project aims at developing and validating low-cost spinel-based materials synthesized with a multi-component alloy precursor for solid oxide f…
Project activities include the design, development, and field testing of environmentally safe contrast agents and geophysical methods to assess the…
B26 ground floor will be retrofitted from the main conference room down to the G22 area, carpet, lights, ceiling tiles, paint, etc. …
Remove and reinstall pressure relief valve SW-PRV-001 at 681-3G Pump House #3.…
Replace carpet in Building 751-1A, Room 17 using standard blue carpet squares.…
Perform cleaning, seal coating, and restriping of parking lots in A-Area, B-Area, C-Area, and N-Area.…
The contents of the 607-18A Trade Waste Tank will be removed, and the remaining sludge of silver will be recycled as a precious metal rather than d…