The planned work scope is for the removal of floor tile and mastic known to contain asbestos in Room 54 of Building 713-N. Dispose of asbestos con…
Subcontractor will provide assembly and disassembly roof repairs at Building 105-L. The subcontractor "will not" disturb the existing roof while p…
NDE Inspection of the DBCF underground piping. The piping is approximately 7 ft below grade.…
Award Number: DE-EE0008688 CX(s) Applied: A9, B3.6, B5.1, Building Technologies Office Location(s): FL Office(s): Golden Field Office
Award Number: DE-EE0007494 CX(s) Applied: A9, B5.1, B5.23 State Energy Program Location(s): WI Office(s): Golden Field Office
Subcontractor will provide renovations to 773-A, outside entrance canopy and surrounding area.…
Materials Science group is in need of services for operating a Helium Leak Detector inside A-773000-OGE-GB-34. The leak detector will be used in s…
Project Management & Construction Services (PMCS) will be installing a new electric plant air compressor near Building 725-2N.…
The BAC behind B5 will be demolished as per the attached SOW.…
Study of chemical and transport phenomena in geological subsurface materials associated with injection of gases/fluids. Involves high pressure imme…