Paint 12 wellheads at the brine disposal area, and blast and paint the prover piping.…
Perform a Differential Global Positioning System survey, for XYZ Mapping, of the SPR pipelines.…
On-site testing, inspection, and calibration of the electrical equipment at the main site.…
At the Nevada National Security Site (NNSS), ecosystems would be monitored to ensure compliance with laws and regulations for the protection of bio…
Excavate to correct the underground domestic water leak Southeast of 281-15H…
Installation and operation of a Stand Alone Gas Dilution Manifold in 234-H, room 267 to support development of low concentration tritium gasstandar…
This work will replace existing HVAC systems located in building 735-7A due to the age and the condition of the equipment.…
The project objective is to produce a proof of concept for enhanced mechanical performance and durability of portland cement-based reinforcedcompos…
The ICW Booster Pump and motor need to be replaced due to age.…
The Inert Metalography Laboratory Tritium Recovery System (IML TRS) is no longer operational and permanently out of service.…