Award Number: DE-EE0008954, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): VA, Office(s): Golden Field Office
CX-022650: Phytodetectors, Inc.-Functional Engineering of a Photosynthetic Desalination Pump Circuit
Funding will support the project team's small-scale research and development activities to design and engineer a genetic circuit encoding a synthet…
Base Camp Operation services to assist in recovery and restoration after unplanned drawdown…
Fabrication and testing of mixed potential sensors, training of artificial neural network, and electronics construction for wireless sensors.…
Inspection and treatment of approximately 414 wooden street and fence Poles in K-Area.…
As part of the modified Phase 4 plan for the 288-F Ash Basin Landfill Reclamation Project, this activity will involve relocation of approximately3,…
This EEC is written to cover solvent qualifications associated with the Salt Waste Processing Facility, SWPF.…
Construction personnel will repair floors, walls, and ceilings on the 4th Level of H Canyon as specified in the referenced work order.…
The proposed activity is to replace the roofing systems over 773-A, E-004, 008, 131 and conduct warranty repairs as needed.…
The Materials Compatibility and Welding Technology group presently houses three electrical resistance welding stations, two self contained lowpower…