Repair, resurface, and repaint the EIFS. …
These two methods determine the concentration of oxygen/nitrogen/hydrogen and carbon/sulfur in various materials.…
Aqueous corrosion testing is performed for numerous materials in solutions composed of an array of chemicals.…
Funding will support the project team's small-scale research and development activities to deploy Switched Source’s Tie Controller (TC) on the…
Award Number: DE-EE0009123, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
Project Management & Construction Services (PMCS) operates an insulation fabrication shop at 717-10N.…
Construction personnel will renovate the interior of Building 701-1H.…
Award Number: DE-EE0008956, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): IA, Office(s): Golden Field Office
Award Number: DE-EE0008953, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): NJ, Office(s): Golden Field Office
CX-021556: U.S. High Performance Research Reactor (HPPR) Low Enriched Uranium (LEU) Fuel Development
The proposed action irradiates the MURR DDE in the Advanced Test Reactor (ATR) northeast flux trap whereas the Element Test (ET)-1, ET-2, and ET-3…