The scope of this project will be to develop and activate two new glovebox confinement enclosures in the South Workroom of the Fuel Manufacturing …
The proposed action is to install a water line (approximately 15 to 20 feet in length) to support filling of a cooling tower chemical injection ba…
The purpose of this revision is to update the scope for the proposed Carbon Free Power Project (CFPP).…
Construction of an approximately 65,000 square foot facility consisting of wet chemistry and various mechanical laboratories and including a highba…
Subcontractors will repair the roof on Building (Trailer) 221-24H…
This activity scope includes the installation, operation and maintenance of a Thermotron DSX-6650 vibration system.…
The acetylene service is being air gapped and capped out in 773-2A in order to comply with new calculations for flammability and explosives ...…
Prepare and measure rheology of H canyon samples.…
K-Area public address system in 704-K (War Room) and 701-2K (Command Area) will be upgraded.…
The purpose of this activity is to prepare soil samples containing known amounts of silver.…