Award Number: DE-EE0009122, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): MI, Office(s): Golden Field Office
Award Number: DE-EE0009140, CX(s) Applied: A9, B3.6, B2.2, Advanced Manufacturing Office, Location(s): DC, Office(s): Golden Field Office
The purpose of this EC is to replace the existing cask bagging ring vacuum and purge system controls in the Hot Fuel Examination Facility (HFEF), M…
In support of this project, INL subject matter experts (SMEs) will conduct the following tasks and level of effort (LOE) work.…
Improve the access and egress of heavy truck traffic on and off the BC Site at the South Gate.…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to remove all WAPA-owned substation equipment at the Malta (MAL)…
LM is proposing to redevelop one standpipe (MW-02) in the disposal cell toe at the Rifle, Colorado, Disposal Site to clear the standpipe of biofou…
Facilities & Site Services is proposing to upgrade the road to priority 2 to allow for regular maintenance and upkeep.…
The outdoor Motor Control Center (MCC) requires replacement due to age and cost and availability of replacement parts.…
Pour two concrete pads near 794-A, and install platforms to allow gauge readings at the fuel tank to be safely taken and to allow safe access the s…