Insulate domestic water line above restroom in Bldg. 717-8N.…
These work activities are associated with the electrical repairs/upgrades to building 717-3N.…
Install two prefabricated trailers (705-57H and 705-58H) in the northeast parking lot of 766-H.…
Installation of Video Teleconference (VTC) at 709-7G Room 102.…
Grind concrete floor to assure proper operation of the installed room divider at 705-3C room 134 per AOS work request 00841143.…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor.…
Installation of new Quad wide trailers (707-69B, 707-72B, 707-73B, 707-74B, and 707-75B) and utilities and two restroom trailers and utilities (707…
The Hand Geometry Units (HGU) for access to 703-42A requires replacement. The ability for designated qualified personnel to access their work space…
Project involves the implementation of an internal network monitoring system across the advanced distribution management system (ADMS). Also includ…
This Amended Determination follows the approval of additional funding, extended period of performance, new teaming partners, and new project milestones to support the project team's small-scale research and development activities of an anode-free sodium cell comprising safe, low-cost, fluorine-free liquid electrolyte materials.