The project will segment the existing four radial distribution feeders into smaller "blocks" to improve system reliability and resiliency during ex…
Improving the thermal envelope, replacing the HVAC system, upgrading the “black start” diesel generator systems of the generating plant, and instal…
The City of Ruston plans to convert approximately 3,780 linear feet of existing overhead electrical distribution infrastructure to underground cond…
Convert approximately 2.0 miles of existing overhead electric utility line to underground line. The two areas identified for the Underground Initi…
The non-functional 730-1B Charging station will be replaced and in the process brought up to current fire protection requirements with increased fu…
Perform laboratory development of new membrane electrode assembly materials and stack hardware. Install engineering-scale, 10 kilowatt-electric (k…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Lyons-Longmont N…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Gering-Wildcat 3…
Funding will support the project team's small-scale research and development of a complete after-treatment package system for existing lean- and ultra-lean burn natural gas engines used for power generation, aiming to significantly increase methane conversion efficiency by over 99 percent.
The Materials Technology and Energy group and the Advanced Engineering group presently house three electrical resistance welding stations, inductio…