KEM Electric Cooperative plans to replace protective devices within existing substation fences and at existing wood pole locations in existing util…
Bonneville Power Administration (BPA) proposes to acquire a revenue meter that was previously installed by Benton County Public Utility District No…
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Umatilla Indian Reservation (CTUIR) to address non-recurring …
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes of the Warms Springs Reservation of Oregon (CTWS) to remove western …
Replace posts and cables that span Lower Three Runs, Steel Creek and Four Mile creek bed. These cables support the flow tracking device used to mea…
Disassemble and Remove UPS System and repair sheetrock in 702-F. The UPS battery system is no longer in use, and it needs to be removed from 702-F.…
Install new associated utilities to support a new Ice Maker in 217-3H.…
This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities. Although individual building numbers, …
DOE proposes to grant authorizations for export of excess electricity, pursuant to DOE's authorities described in Part II, Section 202(e) of the Federal Power Act (FPA).
In support of the Disposition Planning for the K-Area Complex, Building 108-4K is proposed for Dismantlement and Removal (D and R).…