Bonneville Power Administration (BPA) proposes to allow GRI to perform geotechnical testing and soil sampling, on behalf of KPFF and Tualatin Hills…
Office of NEPA Policy and Compliance
July 24, 2026Bonneville Power Administration (BPA) proposes to allow GRI to perform geotechnical testing and soil sampling, on behalf of KPFF and Tualatin Hills Park and Recreation District (THPRD), within the Oregon City-Stub C and Keeler-Oregon City, No. 2 transmission line right-of-way (ROW), in the City of Beaverton, Oregon, adjacent to Highway 26.