Categorical Exclusion (CX) Determinations By Date

The Sylvania electrical system would like to replace all existing three phase poles that are failing within the electrical system. Over 90 percent…
The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…