The aboveground make-up water piping behind 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This work removes …
The scope of work for this project involves the refurbishment of the women's changing room on the first level of 221-H. The tasks include wall repa…
This activity will investigate, down-select, and test hydrogen compression systems in lab 155 in 999-2W. Various equipment will be utilized to acco…
The operation of a manual vertical mill machine at Building 999-2W, Lab 137 and associated wastes generated.…
Bonneville Power Administration (BPA) proposes to perform routine road maintenance, repair and improvements on the Applegate Butte Radio Site Acces…
SEAPA plans to construct a new, supplementary 115kV substation with a 25MVA transformer in a previously disturbed electric utility easement in Ketc…
Task 6 involves reconstruction and partial relocation of two 115kV transmission line segments. One 2-mile segment, and one 8-mile segment. Task 11 …
The scope of work proposed within IRON-RI is the reconductoring of a power line. Specifically, Rhode Island Energy proposes reconductoring a one-mi…
Rewire 702-A with CAT6A wire for installing hall monitors.…
Pump Out Waterjet Tank in 773-50A.…