HVAC unit ACU-4 in security building 705-A will be replaced due to age and deterioration. Replacement D and R and installation activities will be c…
Repurposing the Next Generation Solvent (NGS) building at the Salt Waste Processing Facility (SWPF) to store Nitric Acid for the cleaning of the St…
The FTF Facility needs a permanent design for supplying Chromate Water (CRW) to F-Tank Farm tanks above grade. The route will start east of Tank 25…
Correct Adjustable Center of Gravity Lift Fixture (ACGLF) Hydraulic Leak at 660-3E.…
The U.S. Environmental Protection Agency (USEPA) and the South Carolina Department of Environmental Services (SCDES) approved soil vapor extraction…
This activity at the M-1 Air Stripper will extend two heat trace circuits.…
This new CX determination has been signed due to the addition of installation locations/charging stations.…
The goal of the project is to research, develop, and demonstrate a Unified Power Flow Transformer (UPFT) with integrated power electronics enabling…
1. Rebuild 0.8 miles of electrical distribution line by removing the above ground cross-country (away from Hwy 43 roadside) electrical powerline an…
This Third Amended Determination follows the approval of additional funding, an extended period of performance, a change of teaming partners, and new project milestones to support the project team's small-scale research and development activities of developing an energy storage and power generation (ESPG) system consisting of fuel-to-electric power conversion devices, metal-supported solid oxide fuel cells (SOFC) and turbogenerators, in progress under the Range Extenders for Electric Aviation with Low Carbon and High Efficiency (REEACH) Phase 2 Program.