This Fourth Amended Determination follows the approval of additional funding, period of performance, and new project milestones to support one proj…
BPA proposes conducting access road improvements and repairs along the Rocky Reach – Maple Valley No. 1 line from line miles 99 to 103. The work wo…
New RSWF capability/unit to design and install a storage pad for NRIC microreactors post-irradiation. Construction of a storage pad and necessary u…
Facility B21-615, a newly constructed building located at the Central Facilities Area (CFA) Gun Range, currently has limited access. At present, en…
The Antares R1 Mark-0 Reactor Project at Idaho National Laboratory (INL) involves deploying and operating the Antares R1 Mark-0, a small, high-temp…
This scope of work was previously evaluated under EEC OBU-H-2019-0019. Since a revision was required and the EEC database no longer uses the previo…
Bonneville Power Administration (BPA) proposes to fund the Columbia River Intertribal Fish Commission to develop two temporary staging areas near t…
Bonneville Power Administration (BPA) proposes to replace the propane engine generators (EGs) that provides emergency power supply at three radio …
Southern Iowa Electric Coop will install line monitors and line fault indicators on substation feeders and critical locations to assist in monitori…
Franklin Rural Electric plans to replace an existing oil filled distribution hydraulic recloser with an S and C TripSaver II electronic recloser, a…