Valve 442 has been determined to not be necessary to control the flow of sodium hydroxide to tanks 701 and 710 located in H-area outside facilities…
Replace the fire control panels in H-Canyon crane area.…
Salt simulants and cementitious waste forms will be made at EDL for testing up and including to 55-gallons.…
East River requested a new bay addition at WAPA's Beresford Substation in South Dakota. …
The Legacy Management Support (LMS) SOARS team proposes to remove the current data collection equipment at each of the 14 monitoring wells and inst…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the heating, ventilation, and air conditioning (HVAC) sy…
Bonneville Power Administration (BPA) is proposing to fund the Confederated Salish and Kootenai Tribes (CSKT) to purchase the Jocko Canyon property…
The Central Alarm Station (CAS) is important for safe and effective operation of the Bettis Site. The CAS houses servers, computers, and monitoring equipment associated with systems to ensure safe operations.
This is primarily an R and D study that is mostly using mine tailings and other coal wastes to create carbon-based building materials in lab and be…
Install telecommunications to 706-B.…