Project's primary objective is site characterization including a 3D seismic survey in Chambers, Jefferson, and Liberty counties, TX.…
Project's primary objective is to complete a storage complex feasibility study. This CX covers only Group A activities, which include routine admin…
The U.S. Department of Energy (DOE) is proposing to administer Congressionally Directed Spending to the Metlakatla Indian Community to fund the des…
Subcontractor shall remove propane from the Lead Melter Propane Tank at 711-4N so Construction may replace the failed Rego manifold and test PRVs(P…
This Temporary Modification will install a Peterson Products Company Multi-Flex inflatable plug inside manhole P68 near the 234-H cooling towers.…
The National Nuclear Security Administration proposes to renew a license with the State of Nevada ("State") for a microwave communication site at S…
Restore Tank 709 level control to original design with new float style Kimray level controller (LC-415) in H Canyon.…
Subcontractor will repair 790-5B. The Subcontractor will not disturb the existing roof while performing these repairs on 790-5B.…
Subcontractor will repair 730-1B. The Subcontractor will not disturb the existing roof while performing these repairs on 730-1B.…