This scope of work covers the removal and installation of the existing partitions and wall repair in the men's restroom at 725-N.…
CSX owns, operates, and maintains a north/south rail line on/adjacent SRS (which includes access to a 50-foot Rights of Way on both sides of center…
Removal of existing carbon analyzer and installation of newer model in Glovebox No. 54 in Building 773-A, B-139.…
This work will characterize contaminants of interest (238U, 90Sr, 129I, and 3H) in F-Area groundwater.…
The objective of this R and D project is to convert carbon and nitrogen sources to increased value liquid products via electrocatalysis using nanoc…
Metallic alloys will be heat treated and/or oxidized in a controlled atmosphere as needed to support hydrogen research covered in separate EECs and…
This scope covers the venting of small quantities (t,1 L/min) of gas (hydrogen, nitrogen, argon) from a permeation test system at 999-2W, lab 134.…
STAR pad trailer complex grading and sidewalk replacement, Phase 1, will take place in B-Area.…
709-8G Install Bunkhouse Trailer/sleeping quarters and parking lot.…
The U.S. Department of Energy (DOE) is proposing to provide Congressionally Directed Spending to the Bonneville Environmental Foundation for the in…