The aboveground make-up water piping behind 285-H basin is out of service and creates an unnecessary trip hazard and leak point. This work removes …
The scope of work for this project involves the refurbishment of the women's changing room on the first level of 221-H. The tasks include wall repa…
This activity will investigate, down-select, and test hydrogen compression systems in lab 155 in 999-2W. Various equipment will be utilized to acco…
The operation of a manual vertical mill machine at Building 999-2W, Lab 137 and associated wastes generated.…
Bonneville Power Administration (BPA) proposes to perform routine road maintenance, repair and improvements on the Applegate Butte Radio Site Acces…
Bonneville Power Administration (BPA) proposes to maintain low growing vegetation communities in specific, localized areas in and adjacent to the L…
Bonneville Power Administration (BPA) is proposing to replace multiple deteriorating wood pole structures and associated hardware at specific locat…
Bonneville Power Administration (BPA) proposes to replace in-kind wood pole structures and associated structural/electrical components (e.g., cross…
Bonneville Power Administration (BPA) proposes to fund the Shoshone-Paiute Tribes of the Duck Valley Indian Reservation (Sho-Pai Tribes) to install…
Louisiana LNG Infrastructure LLC (Louisiana LNG) filed a "Request for Extension of Export Commencement Deadline" (Request) with the Office of Fossil Energy and Carbon Management (FECM) (now the Hydrocarbons and Geothermal Energy Office) on May 29, 2025, pursuant to section 3 of the Natural Gas Act (NGA) and 10 CFR Part 590 of the Department of Energy's (DOE) regulations.