Remove all insulation from around the condensate tank at 184-K.…
Replace 704-C shop air compressor.…
Subcontractor will provide roof repairs at 705-3C. The Subcontractor will not disturb the existing roof while performing these repairs on 705-3C. R…
Repair Roof Coating at 703-44A.…
The Knolls Laboratory L4 Pumphouse Sinkhole Repair Project is being undertaken to repair an existing concrete retaining wall along the edge of the Mohawk River where the river water flow is eroding the retaining wall and the surrounding shale rock face.
The Cooling Operations Optimized for Leaps in Energy, Reliability, and Carbon Hyperefficiency for Information Processing Systems 1.5 (COOLERCHIPS 1.5) Program consists of projects selected from the first phase of the COOLERCHIPS program for additional funding, extended period of performance, and new project milestones to continue development of water-free, advanced cooling systems for high-power data centers demanded by artificial intelligence (AI).
Funding will support the project team's small-scale research and development of non-volatile solid refrigerants for use in heat exchangers and cooling systems.
Bonneville Power Administration (BPA) proposes to fund the Confederated Tribes and Bands of the Yakama Nation’s (YN) fisheries program to install a…
Bonneville Power Administration (BPA) proposes to repair approximately 1.5 miles of access roads damaged by a landslide near Structure 57/1 of the …
Testing at subambient temperatures in 773-A B-061 requires a chamber and chiller to maintain subambient temperatures. Heat transfer fluid is used b…