Install a 76.8 kWh Battery Energy Storage System (BESS) to operate in conjunction with the pre-existing solar photovoltaic (PV) array at Kids are U…
The Western Area Power Administration (WAPA) Upper Great Plains Customer Service Region (UGP) routinely conducts activities that are part of the da…
Road 6 Milling, Paving, and Striping.…
Road 8 Milling, Paving, and Striping.…
This activity details the general operation of polymer additive manufacturing (AM) equipment (aka, 3D printers) at the AMC (935-W, Labs 136, 137, a…
Installing a carport on asphalt behind the building center 225-6H and anchoring the carport into that asphalt.…
Non-slip matting will be installed on sample platform walkways at sample location FM-H1 on Crouch's Branch.…
Replace the door and door frame leading into room No. 276 from room No. 274 in building No. 703-46A.…
Ion exchange resin test for simulated solution with cerium ammonium nitrate.…
Install an upgraded automatic metering system in the Southern Illinois region. AMI equipment will be mounted or installed on existing infrastructur…