Install/relocate new fire extinguisher hanger brackets in 221-H.…
This activity details the general operation of polymer additive manufacturing (AM) equipment (aka, 3D printers) at the AMC (935-W, Labs 136, 137, 1…
The current capacity of 607-7B Sanitary Lift station is undersized based on existing personnel loading in building 730-2B and 730-4B. The 607-7B sa…
Construction to remove old carpet and cove base. Paint the exterior walls and any other walls/office areas identified in 730-1B, 2nd Floor. Revisio…
Planned maintenance activities at the 285-H Facility include patching leaks within and surrounding the 285-H Basin, inspecting steel channels withi…
Install electrical and build entry steps at 725-4N (Paint Storage Building).…
Installation of new plant air line and hose reel at 717-10N.…
Prep and Paint 623-29G Communications Tower.…
WAPA proposes to acquire temporary access rights from willing private landowners for three areas and temporary access permissions from the U.S. Bur…
Although a prior categorical exclusion (CX-028370) addressed acquisition of land, substation assets, and an access road easement for the Cottonwood…