Savannah River Site (SRS) has identified potential locations that could support a utility-scale solar power plant to achieve the goal of 100 percen…
This proposal is for a 3-year extension (2025-2028) to Cooperative Agreement DE-FC02-04ER54698. The proposal includes General Atomics' role as host…
We will conduct tracer testing, fiber optic measurements, and establish circulation operations in order to characterize the fractures created at th…
Perform site characterization and sampling, construct stratigraphic wells, and complete laboratory analysis of samples.…
The project will involve replacing existing expulsion fuses and arresters with non-expulsion types on power lines to reduce wildfire risk, conducti…
Assembly of modules, Laboratory scale research, Testing of battery system in an outdoor research facility, Final assembly of ESS, and Installation …
Sub-recipient will develop a Wildfire Mitigation Plan, to assess and reduce wildfire risk, and improve the reliability and resilience of the AE ele…
Install two (2) new monitoring and control points on existing utility poles in existing ROW.…
CX-034131: Access Road Improvement for Residential Use on North Bonneville-Midway No. 1 Right-of-Way
Bonneville Power Administration (BPA) proposes to allow a private landowner to use and improve or perform maintenance on portions of existing acces…
Bonneville Power Administration (BPA) is proposing to replace two steel lattice towers on the Sammamish-Maple Valley No. 1 transmission line (15/5 …