Renovate office spaces at 704-C.…
Replace flooring in rooms 1 and 2 at 702-D.…
Provide labor, material, and services required for the removal of a degraded overhead door and the installation of a new like-for-like overhead doo…
Replace light fixtures with LEDs at 717-10N SRMC storage side and remove/reattach signage currently attached to fire protection waterlines to walls…
This scope covers renovations required on the exterior of Building 713-6N.…
Change Out Nickel Cadmium Battery on diesel generator 154-5K with a new maintenance free lead acid battery.…
Clear underbrush west of 719-H as a potential location for a covered refrigerant shed for SRTE. Rev. 1 - Revising to update location of storage loc…
The Advanced Reactive System Screening Tool (ARSST) will be used for the qualification of a new batch of Reillex HPQ Resin. Testing in the ARSST is…
Detection of water content of calcium chloride from the salt pressing or pyro processes.…
The purpose of this Project Task Statement is to define the scope of work required to support Deployable Energy’s experimental objectives. This inc…