Biomedical Research 300 Area CX(s) Applied: B3.12 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Small Scale Research CX(s) Applied: B3.6 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Clean Start - Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 08/01/2012 Location(s): Arizona, Colorado, Oregon, Texas, Washington Offices(s): National Energy Technology Laboratory
Routine Maintenance 300 Area CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Siting, Modifying and Operating Support Buildings CX(s) Applied: B1.15 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Safety Environmental Improvements 300 Area CX(s) Applied: B2.5 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Bonneville Power Administration/Washington Department of Natural Resources Access Road Improvements CX(s) Applied: B1.3 Date: 07/30/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Four AT&T Wireless Communication Site Upgrades CX(s) Applied: B1.7, B1.19 Date: 07/27/2012 Location(s): Washington, Washington, Washington, Washington Offices(s): Bonneville Power Administration
Nesting Bird Deterrent Study at the 241-C Tank Farm CX(s) Applied: B3.8 Date: 07/26/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Short-term Additional Amendments to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 07/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration