Revenue Meter Replacement at Franklin County Public Utility District’s (PUD) Taylor Flats Substation CX(s) Applied: B1.7 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Wenatchee District Wood Pole Replacements CX(s) Applied: B1.3 Date: 03/22/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Install High Frequency Antennas at Bonneville Power Administration Maintenance Headquarters CX(s) Applied: B1.19 Date: 03/21/2013 Location(s): Oregon, Washington, Washington Offices(s): Bonneville Power Administration
Home Energy Score Partner Implementation Model CX(s) Applied: A9 Date: 03/14/2013 Location(s): Washington Offices(s): Golden Field Office
Revenue Meter Replacement at Benton County Public Utility District’s (PUD) Finley Substation CX(s) Applied: B1.7 Date: 03/13/2013 Location(s): Washington Offices(s): Bonneville Power Administration
2013 Spacer and Insulator Replacement Program: First and Second Quarter Projects CX(s) Applied: B1.3 Date: 03/11/2013 Location(s): Oregon, Oregon, Washington, Montana, Montana Offices(s): Bonneville Power Administration
Coulee-Westside Transfer Trip Replacement CX(s) Applied: B1.7 Date: 02/06/2013 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
MSA Annual Categorical Exclusion for Facilities for Storing Packaged Hazardous Waste for 90 Days or Less CX(s) Applied: B6.4 Date: 01/22/2013 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Thermoelectric Generators for Direct Conversion of Vehicle Waste Heat in Useful Electric Power CX(s) Applied: B3.6 Date: 01/16/2013 Location(s): Washington Offices(s): National Energy Technology Laboratory
Innovations in Advanced Materials and Metals (IAM2) CX(s) Applied: A9, A11 Date: 01/15/2013 Location(s): Washington Offices(s): Golden Field Office