Raver Substation-Control House Expansion & Seismic Retrofit CX(s) Applied: B4.11 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Indian Creek Property Funding CX(s) Applied: B1.25 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Pacific Northwest National Laboratory- Low-cost Efficient Manufacturing of Pressurized Conformal Compressed Natural Gas CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): Washington, Nebraska Offices(s): Advanced Research Projects Agency-Energy
AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration
D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek CX(s) Applied: B1.19 Date: 08/06/2012 Location(s): Washington Offices(s): Bonneville Power Administration
CH2MHill Plateau Remediation Company - Asbestos Removal Actions CX(s) Applied: B1.16 Date: 08/03/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Wautoma-Ostrander Surface Impairment Removal CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
North Bonneville-Midway No. 1 Tower 75/4 Replacement CX(s) Applied: B1.3 Date: 08/01/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Site Characterization and Environmental Monitoring on the Hanford Site CX(s) Applied: B3.1 Date: 08/01/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office