Support Buildings CX(s) Applied: B1.15 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Office of NEPA Policy and Compliance
June 3, 2014Support Buildings
CX(s) Applied: B1.15
Date: 06/03/2014
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company and its subcontractors perform siting, construction or modification, and operation of support buildings and support structures (including, but not limited to, trailers and prefabricated and modular buildings) within or contiguous to an already developed area (where active utilities and currently used roads are readily accessible).
CX(s) Applied: B1.15
Date: 06/03/2014
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company and its subcontractors perform siting, construction or modification, and operation of support buildings and support structures (including, but not limited to, trailers and prefabricated and modular buildings) within or contiguous to an already developed area (where active utilities and currently used roads are readily accessible).