Categorical Exclusion Determinations: Washington

Franklin-Badger Canyon and Grandview-Red Mountain Switch Replacements CX(s) Applied: B1.3 Date: 10/18/2012 Location(s): Washington Offices(s): Bonneville Power Administration
CH2MHill Plateau Remediation Company - Siting, Construction, and Operation of Support Buildings and Support Structures CX(s) Applied: B1.15 Date: 10/04/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Proposed Sale of Bonneville Power Administration (BPA) Fee Owned Property to Washington State Department of Transportation (WSDOT) for Interstate On and Off Ramps CX(s) Applied: B1.24 Date: 10/01/2012 Location(s): Washington Offices(s): Bonneville Pow...
Amendment Number 2 to the Port Townsend Paper Corporation Power Sales Agreement CX(s) Applied: A2 Date: 10/01/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration
NORM Mitigation and Clean Water Recovery from Marcellus Frac Water CX(s) Applied: B3.6 Date: 09/25/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory
CH2MHill Plateau Remediation Company - Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Rerouting of Power Lines at 100-D Reactor in Support of Site Remediation CX(s) Applied: B4.13 Date: 09/24/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office