Synthetic Microorganisms to Enable Lignin to Fuel Conversion CX(s) Applied: A9, B3.6 Date: 04/15/2013 Location(s): Texas, Georgia, Washington Offices(s): Golden Field Office
Pacific Northwest National Laboratory- Novel Membrane Dehumidifier-enabled Air Cooling CX(s) Applied: B3.6 Date: 04/15/2013 Location(s): Washington, Ohio, Texas Offices(s): Advanced Research Projects Agency-Energy
Pacific Northwest National Laboratory- Genset Heat Recovery Adsorption Chiller for Navy Forward Operations Bases CX(s) Applied: B3.6 Date: 04/11/2013 Location(s): Washington, Oregon, Georgia Offices(s): Advanced Research Projects Agency-Energy
Chinook Property Funding - Update CX(s) Applied: B1.25 Date: 04/09/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Digital Communication System Upgrade Project: ‘D’ Analog System Retirement and #WC SONET Ring CX(s) Applied: B1.19 Date: 04/05/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Augspurger Radio Tower Replacement Project CX(s) Applied: B1.19 Date: 04/03/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Activity-Specific Categorical Exclusion for Deep Borehole Drilling, Sampling, and Characterization for the Proposed Natural Gas Pipeline from Pasco, Washington to the Hanford Site 200 East Area CX(s) Applied: B3.1 Date: 04/03/2013 Location(s): Washing...
Chinook Property Funding CX(s) Applied: B1.25 Date: 04/01/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Fairmount Substation Equipment Acquisition CX(s) Applied: B1.24 Date: 03/27/2013 Location(s): Washington Offices(s): Bonneville Power Administration
Install Rip Rap Along Stream Bank at Two Wood Pole Structures Located Along the Bell-Boundary No. 3 Transmission Line CX(s) Applied: B1.3 Date: 03/25/2013 Location(s): Washington Offices(s): Bonneville Power Administration