Provision of Funds to the Washington Department of Fish and Wildlife (WDFW) CX(s) Applied: B1.25 Date: 09/04/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Enhancement of SOFC Cathode Electrochemical Performance Using Multi-Phase Interfaces CX(s) Applied: B3.6 Date: 08/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory
Bingen Substation Sectionalizing Switches Disposition CX(s) Applied: B1.24 Date: 08/27/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Driscoll-Naselle No. 1 Access Road Maintenance CX(s) Applied: B1.3 Date: 08/21/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Raver Substation-Control House Expansion & Seismic Retrofit CX(s) Applied: B4.11 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Indian Creek Property Funding CX(s) Applied: B1.25 Date: 08/14/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Pacific Northwest National Laboratory- Low-cost Efficient Manufacturing of Pressurized Conformal Compressed Natural Gas CX(s) Applied: B3.6 Date: 08/14/2012 Location(s): Washington, Nebraska Offices(s): Advanced Research Projects Agency-Energy
AT&T Fiber Addition North Bonneville-Ross No. 2 CX(s) Applied: B4.7 Date: 08/09/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Sno-King Substation Expansion CX(s) Applied: B4.11 Date: 08/08/2012 Location(s): Washington Offices(s): Bonneville Power Administration
D Analog Communications Retirement at Del Rio, Chief Joseph, and Foster Creek CX(s) Applied: B1.19 Date: 08/06/2012 Location(s): Washington Offices(s): Bonneville Power Administration