Alstom Grid Commercial Microgrid Design Development and Testing for PIDC and PWD System
CX(s) Applied: A1, A9, A11, B3.6, B4.4, B5.15
Date: 02/04/2015
Location(s): Washington
Offices(s): National Energy Technology Laboratory

Investigate, define, and augment an existing distribution grid simulator and substation, distribution & data automation platforms to produce the required operational functions of a microgrid control system.