CX-012660: Categorical Exclusion Determination

McNary-Ross Tower 137/4 Replacement CX(s) Applied: B1.3Date: 41837 Location(s): WashingtonOffices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

July 17, 2014
Estimated Read Time   min
McNary-Ross Tower 137/4 Replacement
CX(s) Applied: B1.3
Date: 41837
Location(s): Washington
Offices(s): Bonneville Power Administration

Bonneville Power Administration (BPA) proposes to replace tower 137/4 on the McNary- Ross No. 1 transmission line because the tower is threatened by ground slide movement.