Disconnection of Utilities CX(s) Applied: B1.27 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Placing a Facility in an Environmentally Safe Condition CX(s) Applied: B1.28 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B5.1 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B2.5 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Washington River Protection Solutions LLC - Proposed Actions For Calendar Year 2012 Scheduled To Take Place CX(s) Applied: B1.23 Date: 01/13/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Limited Firebreak Maintenance on the Hanford Site During Calendar Year 2012 CX(s) Applied: B1.3 Date: 01/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Routine Shipping and Transportation of Regulated and Non-Regulated Material, Equipment, or Waste On and Off the Hanford Site CX(s) Applied: B1.30 Date: 01/05/2012 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Wave Glider-Based Passive Acoustic Detection System CX(s) Applied: B3.6, B3.16, Date: 01/04/2012 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Provision of Funds to the Colville Confederated Tribes for the Purchase of Two Parcels of Land Along the Okanogan River CX(s) Applied: B1.25 Date: 01/04/2012 Location(s): Washington Offices(s): Bonneville Power Administration