Categorical Exclusion Determinations: Washington

Siting, Construction, Modifying, and Operating Small-Scale Structures CX(s) Applied: B1.15 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Small Scale Research and Development, Laboratory Operations, and Pilot Projects CX(s) Applied: B3.6 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Pacific Northwest National Laboratory - Reversible Metal Hydride Thermal Storage for High Temeprative Power Generation Systems CX(s) Applied: B3.6 Date: 11/21/2011 Location(s): Utah, Washington Offices(s): Advanced Research Projects Agency-Energy
Sandia National Laboratories - Improved Power System Operations Using Advanced Stochastic Optimization CX(s) Applied: A9 Date: 11/18/2011 Location(s): New Mexico, Iowa, Massachusetts, Washington, California Offices(s): Advanced Research Projects Agenc...
Provision of Funds to the Kalispell Tribe to Purchase the West Calispell Road Conservation Easement CX(s) Applied: B1.25 Date: 11/17/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Charles River Associates International Inc. - Transmission Topology Control for Infrastructure Resilience to the Integration of Renewable Generation CX(s) Applied: A9 Date: 11/15/2011 Location(s): Massachusetts, Pennsylvania, Washington Offices(s): Ad...
Pacific Northwest National Laboratory - Electric-Powered Adsorption Heat Pump for Electric Vehicles CX(s) Applied: A9, B3.6 Date: 11/15/2011 Location(s): Florida, Washington Offices(s): Advanced Research Projects Agency-Energy
331 Aquatic Research Laboratory Upgrades at the 331 Building CX(s) Applied: B3.6 Date: 11/15/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office