300 Area Nanoscale Research and Development Projects CX(s) Applied: B3.15, A9, B3.6 Date: 12/06/2011 Location(s): Washington Offices(s): River Protection-Richland Operations Office
McNary-Horse Heaven 230-kilovolt Transmission Line Raise (Structures 15/2 to 16/3) CX(s) Applied: B1.3 Date: 12/01/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Bottom Fixed Platform Dynamics Models Assessing Surface Ice Interactions CX(s) Applied: A9 Date: 11/30/2011 Location(s): Washington Offices(s): Golden Field Office
Ashe-Marion #2 Spacer Replacements CX(s) Applied: B1.3 Date: 11/29/2011 Location(s): Oregon, Oregon, Washington, Oregon, Oregon Offices(s): Bonneville Power Administration
Longview Sectionalizing Breaker Upgrades CX(s) Applied: B1.11, B4.6 Date: 11/28/2011 Location(s): Washington Offices(s): Bonneville Power Administration
Safety and Security Component Installation and Alteration CX(s) Applied: B1.11, B2.2 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Minor Road and Utility Operations CX(s) Applied: B1.3, B1.7, B1.13, B1.32, B4.7 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Outdoor Tests on Materials and Components CX(s) Applied: B3.11 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Training Programs, Exercises, and Drills CX(s) Applied: B1.2 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office
Site Characterization and Environmental Monitoring CX(s) Applied: B3.1 Date: 11/28/2011 Location(s): Washington Offices(s): Science, Pacific Northwest Site Office