Disconnection of Utilities CX(s) Applied: B1.27 Date: 06/03/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Office of NEPA Policy and Compliance
June 3, 2014Disconnection of Utilities
CX(s) Applied: B1.27
Date: 06/03/2014
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company and its subcontractors perform actions that are required for the disconnection of utility services (including, but not limited to, water, steam, telecommunications, and electrical power) after it has been determined that the continued operation of these systems is not needed for safety.
CX(s) Applied: B1.27
Date: 06/03/2014
Location(s): Washington
Offices(s): River Protection-Richland Operations Office
CH2MHill Plateau Remediation Company and its subcontractors perform actions that are required for the disconnection of utility services (including, but not limited to, water, steam, telecommunications, and electrical power) after it has been determined that the continued operation of these systems is not needed for safety.