CX-012191: Categorical Exclusion Determination

Bell-Boundary Fiber Project (update to previous CX issued on 6/11/13) CX(s) Applied: B4.7 Date: 05/14/2014 Location(s): Washington Offices(s): Bonneville Power Administration

Office of NEPA Policy and Compliance

May 14, 2014
Estimated Read Time   min
"Bell-Boundary Fiber Project (update to previous CX issued on 6/11/13)
CX(s) Applied: B4.7
Date: 05/14/2014
Location(s): Washington
Offices(s): Bonneville Power Administration

In addition to the work described in the previous Categorical Exclusion, Bonneville Power Administration proposes to clear brush, trim tree limbs, and remove up to 10 trees to enable equipment to install the underground fiber optic cable within about 10 feet of the Sacheen Radio Station fence. "