Repair of Big Hill Texas-14 Transformer CX(s) Applied: B1.3 Date: 06/24/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Routine Administrative, Maintenance, and Operating Activities at Pantex Plant for 2014 and2015 CX(s) Applied: B1.3 Date: 09/16/2013 Location(s): Texas Offices(s): Pantex Site Office
Gravity head Energy System (GHES) CX(s) Applied: A9, B3.6 Date: 06/14/2013 Location(s): Vermont, Texas Offices(s): Golden Field Office
Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature CX(s) Applied: A9, A11 Date: 06/12/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature CX(s) Applied: A9, A11 Date: 06/12/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Trident: A Human Factors Decision Aid Integrating Deepwater Drilling Tasks, Incidents, and Literature CX(s) Applied: A9, A11 Date: 06/08/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Investigation on Pyroelectric Ceramic Temperature Sensors for Energy System Applications CX(s) Applied: B3.6 Date: 06/05/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Use of an Accurate Domain Name System Method to Derive, Validate and Supply Constitutive Equations for the Multiphase Flow with Interphase eXchanges Code CX(s) Applied: A9 Date: 06/03/2013 Location(s): Texas Offices(s): National Energy Technology Labo...
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9, A11 Date: 05/31/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9, A11 Date: 05/31/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory