Environmental Restoration and Waste Management Activities for Pantex Plant for FY 2014 CX(s) Applied: B6.1, B6.2 Date: 09/25/2013 Location(s): Texas Offices(s): Pantex Site Office
Hybrid Membrane-Absorption Carbon Dioxide (CO2) Capture Process CX(s) Applied: B3.6 Date: 09/25/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Thermal-Hydrological-Chemical-Mechanical (THCM) Coupled Model for Hydrate-Bearing Sediments: Data Analysis and Design of New Field Experiments CX(s) Applied: A9 Date: 09/16/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
“Clean Start” – Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 09/16/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
“Clean Start” – Development of a National Liquid Propane (Autogas) Refueling Network CX(s) Applied: B5.22 Date: 09/16/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Diversity in Science and Technology Advances National Clean Energy in Solar CX(s) Applied: A9, B3.6 Date: 09/12/2013 Location(s): Texas Offices(s): Golden Field Office
Distributed Fiber Optic Arrays: Integrated Temperature and Seismic Sensing for Detection of Carbon Dioxide Flow.. CX(s) Applied: A1, A9 Date: 09/11/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Coil Tubing (CT) Drilling and Intervention System Using Cost-Effective Vessels CX(s) Applied: A9 Date: 09/11/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
High Energy, Long Cycle Life Lithium-ion Batteries for PHEV Applications CX(s) Applied: B3.6 Date: 09/10/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
High Power Laser Tool and System for Unique Geothermal Well Completions CX(s) Applied: A9, B3.6 Date: 09/04/2013 Location(s): Colorado, Texas Offices(s): Golden Field Office