Bryan Mound Brine Disposal Pump Replacement (Install) CX(s) Applied: B5.2 Date: 10/28/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
University of Houston--Aqueous Lithium-Ion Batteries with High-Energy Novel Organic Anodes for Safe and Robust Energy Storage CX(s) Applied: B3.6 Date: 10/22/2013 Location(s): Texas, Texas Offices(s): Advanced Research Projects Agency-Energy
Evaluation of Deep Subsurface Resistivity Imaging for Hydrofracture Monitoring CX(s) Applied: A9, A11, B3.6 Date: 10/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Replacement of Deep-Anode Ground Bed Sites for Big Hill Cavern 104 and Site Unit 1 “A”, and BC Cavern 18 CX(s) Applied: B1.3 Date: 10/01/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Real-Time In-Situ Carbon Dioxide Monitoring (RICO2M) Network for Sensitive Subsurface... CX(s) Applied: A11, B4.6 Date: 09/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Safety, Health, and Environmental Improvements for FY2014 and FY2015 CX(s) Applied: B2.1, B2.2, B2.3, B2.5 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Site Characterization, Monitoring, and General Research Activities for Pantex Plant for FY 2014 CX(s) Applied: B3.1, B3.3, B3.6, B3.8 Date: 09/26/2013 Location(s): Texas Offices(s): Pantex Site Office
Mechanisms for Methane Transport and Hydrate Accumulation in Coarse-Grained Sediments CX(s) Applied: A9 Date: 09/26/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Environmental Restoration and Waste Management Activities for Pantex Plant for FY 2014 CX(s) Applied: B6.1, B6.2 Date: 09/25/2013 Location(s): Texas Offices(s): Pantex Site Office
Hybrid Membrane-Absorption Carbon Dioxide (CO2) Capture Process CX(s) Applied: B3.6 Date: 09/25/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory