North Central Texas Alternative Fuel and Advanced Technology Investments CX(s) Applied: B5.23 Date: 08/08/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Replace Big Hill Circuit Breakers OCB-4009, 4010, and 4011 (install) CX(s) Applied: B1.3 Date: 08/08/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
South Louisiana Enhanced Oil Recovery (EOR)/Sequestration Research and Development (R&D) Project CX(s) Applied: A1, A9, A11 Date: 08/05/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1, B3.6 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1, B3.6 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial - Site Three CX(s) Applied: A9 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
High-Pressure Turbulent Flame Speeds and Chemical Kinetics of Syngas Blends With and Without Impurities CX(s) Applied: B3.6 Date: 07/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Coil Tubing (CT) Drilling and Intervention System Using Cost-Effective Vessels (10121-4505-01) CX(s) Applied: A9 Date: 07/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 07/25/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory