Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1, B3.6 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial - Site Three CX(s) Applied: B3.1 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Technology Integration Program - Field Trial - Site Three CX(s) Applied: A9 Date: 08/01/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
High-Pressure Turbulent Flame Speeds and Chemical Kinetics of Syngas Blends With and Without Impurities CX(s) Applied: B3.6 Date: 07/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Coil Tubing (CT) Drilling and Intervention System Using Cost-Effective Vessels (10121-4505-01) CX(s) Applied: A9 Date: 07/30/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Construction of an Autogas Refueling Network CX(s) Applied: B5.22 Date: 07/25/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
The Coal-Seq III Consortium: Advancing the Science of Carbon Dioxide Sequestration in Coal Seam and Gas Shale CX(s) Applied: A9 Date: 07/25/2013 Location(s): Virginia, Texas Offices(s): National Energy Technology Laboratory
Green Gasoline from Wood using Carbona Gasification and Topsoe TIGAS Processes CX(s) Applied: A9, B3.6 Date: 07/18/2013 Location(s): Illinois, Texas Offices(s): Golden Field Office
North Central Texas Alternative Fuel and Advanced Technology Investments CX(s) Applied: B5.22 Date: 07/12/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Bryan Mound Brine Disposal Pump Replacement CX(s) Applied: B5.2 Date: 07/03/2013 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office