Big Hill Site Building Upgrades, Phase II CX(s) Applied: B1.3 Date: 12/11/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Development of Optimal Catalyst Designs and Operating Strategies for Lean Nitrous Oxide Reduction CX(s) Applied: B3.6 Date: 11/28/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Install Temperature Monitoring on Big Hill 36 inch Crude Oil Pipeline CX(s) Applied: B5.2 Date: 11/26/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Evaluation of Concentrated Piperazine for Carbon Dioxide Capture from Coal-Fired Flue Gas CX(s) Applied: A11, B3.6 Date: 11/15/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Collaborative Atomic-Scale Design, Analysis, and Nanofabrication for Record Breaking, Single-Crystal Solar Cell Arrays CX(s) Applied: A9, B3.6 Date: 11/09/2012 Location(s): Texas Offices(s): Golden Field Office
North Central Texas Alternative Fuel and Advanced Technology Investments CX(s) Applied: A1 Date: 11/08/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
South Louisiana Enhanced Oil Recovery/Sequestration Research and Development Project CX(s) Applied: A9, A11 Date: 11/08/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
South Louisiana Enhanced Oil Recovery/Sequestration Research and Development Project CX(s) Applied: A9, A11 Date: 11/08/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Alternate Source of Firewater at Bryan Mound CX(s) Applied: B5.2 Date: 11/05/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Development and Test of a 1,000 Level 3C Fiber Optic Borehole Seismic Receiver Array Applied to Carbon CX(s) Applied: A9, B3.1 Date: 11/01/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory