Power Monitoring, Communication and Control Upgrade at Bryan Mound Degas Plant (Install) CX(s) Applied: B1.7 Date: 10/31/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Midwest Region Alternative Fuels Project CX(s) Applied: B5.1 Date: 10/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Temporal Characterization of Hydrates System Dynamics Beneath Seafloor Mounds: Integrating Time-Lapse CX(s) Applied: B3.6 Date: 10/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Temporal Characterization of Hydrates System Dynamics beneath Seafloor Mounds: Integrating Time-Lapse CX(s) Applied: A9, A11 Date: 10/18/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Development of Improved Caprock Integrity and Risk Assessment Techniques CX(s) Applied: A9 Date: 10/09/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
The Dow Chemical Company CX(s) Applied: B5.7 Date: 10/02/2012 Location(s): Texas Offices(s): Office of Oil and Natural Gas
Gas Hydrate Dynamics on the Alaskan Beaufort Continental Slope: Modeling and Field Characterization CX(s) Applied: A9 Date: 09/27/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Replace Sparge Piping at Bryan Mound Raw Water Intake Structure CX(s) Applied: B1.3 Date: 09/20/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office
Houston Zero Emission Delivery Vehicle Deployment CX(s) Applied: A1, A9 Date: 09/19/2012 Location(s): Texas Offices(s): National Energy Technology Laboratory
Big Hill Fence Extension Modifications CX(s) Applied: B1.11 Date: 09/14/2012 Location(s): Texas Offices(s): Strategic Petroleum Reserve Field Office