Intelligent Blow Out Preventers RAM Actuation Sensor System CX(s) Applied: A9, B3.6 Date: 08/28/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Closure Turf Installation CX(s) Applied: B6.1 Date: 08/27/2013 Location(s): Texas Offices(s): Pantex Site Office
Predictive Large Eddy Simulation (LES) Modeling and Validation for High-Pressure Turbulent Flames and Flashback in Hydrogen-Enriched Gas Turbine CX(s) Applied: A9, B3.6 Date: 08/23/2013 Location(s): Texas Offices(s): National Energy Technology Laborat...
Smart and Calibrated Pig Surveys of Strategic Petroleum Reserve Raw Water/Crude Oil Pipelines CX(s) Applied: B1.3 Date: 08/22/2013 Location(s): Texas, Louisiana Offices(s): Strategic Petroleum Reserve Field Office
A Geomechanical Model for Gas Shales Based on Integration of Stress CX(s) Applied: A9 Date: 08/21/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Industrial Scale Demonstration of Smart Manufacturing Achieving Transformational Energy Productivity Gains CX(s) Applied: A9, B2.2, B2.5 Date: 08/15/2013 Location(s): Texas Offices(s): Golden Field Office
Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect CX(s) Applied: A9, A11 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Deepwater Permanent Subsea Pressure Compensated Chemical Reservoir Construction and Testing CX(s) Applied: A9 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
Gulf of Mexico Miocene Carbon Dioxide (CO2) Site Characterization Mega Transect - Task 8 CX(s) Applied: A1, A9, A11 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory
North Central Texas Alternative Fuel and Advanced Technology Investments CX(s) Applied: B5.23 Date: 08/14/2013 Location(s): Texas Offices(s): National Energy Technology Laboratory