The Environmental Monitoring Group collects samples throughout the year to analyze for radiological and non-radiological constituents. After they a…
Revision 0: The Savannah River Site will replace recovery well RWM-1 with a new recovery well, RWM-001-R, due to a decrease in the groundwater flow…
Installation of two automated overhead switches and an IntelliNode device to self-heal the network in case of a circuit-level power outage.…
Installation of 47 GOABs throughout the electric system and installation of a line monitoring system.…
Isolation of Steam Facilities east of F-Canyon.…
Two flux towers have been installed as described below. This in an "after-the-fact" EEC since installation has been completed.…
Non-hazardous gases remaining in five Silco cans located at HRTL will be vented to atmosphere
SRNL has been tasked with a Leaching Environmental Assessment Framework (LEAF) Interlaboratory Methods Validation Study. This study is to determine…
This EEC covers the use of autoclaves in BSL1 laboratories used by SRNL. The purpose of this project is to oversee the daily general operation of C…
Fabricate permeation tube and generate trace level dimethylmercury gas standards using the permeation tube and a Kintec calibration gas generator s…