This EEC covers work that is done in the High Pressure Laboratory at 723-A. The High Pressure Laboratory pressure tests and leak tests components f…
Installation of Wi-Fi in 713-N.…
Relocate and Demolish N-Area Trailers.…
Replace the 105-L Chiller Unit and system water pump per MT-LCR-2021-00002.…
The scope of this work order is to remove and replace 704-2H HVAC Unit No. 1. The electrical supply will be replaced and upgraded to 30 amps.…
284-19H/20H Replace floor tiles.…
HVAC installed incorrectly. Odor being introduced into the building from recent roof renovations…
The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G and three (3) different a…
Relocate and demolish trailers 706-19C and 706-21C.…
Installation of WI-FI in 735-4B.…