Subcontractor will provide roof repairs at 776-1A.…
The work will look at the effects of exposure to short-chain PFAS and polymeric PFAS (fluoropolymers) on nematodes using indirect and direct exposu…
Remove old/broken poles. Change out poles from single phase to v phase or three phase.…
All Uninterruptible Power Supply (UPS) systems not related to security or cranes will be removed from L-area.…
This EEC covers all low hazard, routine, and repetitive task work activities that can be performed in the Savannah River Mission Completion (SRMC) …
Refurbish/repair domestic water monitoring equipment, wiring, and waterproofing improvements for domestic water pits per attached SOW G-SOW-G-00364…
Solutions and salts of Al, Ce, Cr, Fe, Li, Ni, Mo, Ti, and/or W, and other potential transition metals, will be produced and used in the generation…
Remove old/broken poles. Pull old poles out of the ground and replace with new poles.…
Install compact modular reclosers and remote control units on utility poles above.…
Install overhead switches on electric distribution poles.…