The Bundle Storage (MTR) Rack is Safety Significant Design feature that is located in Section 3 of the Hot Canyon of 221-H. This DCP replaces exist…
Roof Repairs, 705-K…
Subcontractor shall provide inspection and cleaning as necessary of SRS cafeteria Exhaust Hood Systems located in 766-H and 704-S. This effort shal…
This activity is for completing a safe shutdown and deactivation process for F/H Lab (772-F, 772-1F and 285-3F). This process is required to prepar…
Installation of a double-wide trailer in E-Area. This revision includes the installation of a sidewalk along building 704-75E.…
Trailer 704-13Z is to be relocated to area west of 704-84H.…
At the P Area Burning Rubble Pit (131-P) Operable Unit (PBRP OU), four shallow groundwater monitoring wells will be installed along the bank of Ste…
One existing well (CMP010A) is planned for abandonment and replacement well (CMP010AR) is planned for installation at the CMP Pits Operable Unit.…
CX-030090: Design and Replacement of 13.8kV Process Feeders 1 and 2 and Associated Equipment, K-Area
Design and Replacement of 13.8kV Process Feeders 1 and 2 and Associated Equipment, K-Area…
Meter replacement, Implementing AI Dash to track vegetation growth, and software upgrades.…