SRNL will evaluate the activation of new, non-tritiated hydride beds in support and as requested by Savannah River Tritium Engineering.…
Drain Approximately 5 Lead acid batteries located at the Transformer Laydown Yard at 622-N.…
Perform office renovations in 704-L…
Office trailers 704-19H and 225-5H, are approximately 36 years old. The trailers roof, flooring and weather seals surrounding windows and door open…
Replace Lift Station Pumps at 607-66G.…
Six single-wide trailers will be removed and replaced with three new double-wide trailers near gate 16.…
B-Area replacing trailer doors due to water damage.…
The dust collector (Z-205000-BMH-DCOL-0002) for Silo No. 4 is to be replaced.…
Characterization of per- and polyfluoroalkyl substances (PFAS) source area soil contamination, well installation, and volatile organic compound (VO…
Flow sensors are planned for installation at two locations in D Area. One will be installed in the discharge canal (DSWM-8B) and D006 outfall (DSWM…