Apply roof coatings and seal roof leaks.…
This EEC covers "hands-on" activities including the fabrication, assembly, testing and maintenance of equipment and systems designed by the NTS Eng…
Current 233-H CHW piping configuration requires isolating CHW to Central Control Room (CCR) for any work on CHW lines in Rm 16.…
Replace approximately 30 existing, lower kennel brackets with a carbon steel equivalent.…
Remove Space Savers in 730-4B.…
Install Telecommunications to Trailer 704-79E.…
Install UW Drop in Shacks Beside 717-F.…
The proposed work activity is to repair stairs on the roof of Building 221-F and 703-14F.…
709-7G Clear stumps around the building, grade area, and seed.…
Replace five total existing light fixtures in 704-40G, 735-10G, and 782-29G with emergency light fixtures. Remove four total existing emergency lig…