Scope: R and D project requires the use of a Stud Welder to assemble the support structure.…
The EEC covers the sealing and coating of the base of south east corner of building 711-9N.…
This EEC covers the renovation of the upstairs office area in 713-1N to add 3 new offices.…
Air Diffuser Replacements at 766-H.…
Remove Power to the 284-13H and 284-15H Sealand Containers.…
701-4G Remove/replace flooring.…
The proposed activity is to isolate the discharge pathway (Manhole P34) of industrial wastewater generated in F-Area Complex (FAC) from the 281-5F …
Install solar pumping station at river water valve pit.…
The Building for 789-B serves as the back-up water treatment facility for the Site's domestic water system. The building was last upgraded in 1994.…
701-2K is currently on The Electronic Safeguards and Security System (E3S) and operating beyond its intended lifetime. K-Area Facility is funding A…