Subcontractor will perform a roof replacement on 735-B. The Subcontractor will disturb the existing roof on 735-B.…
This EEC covers the repair of ceilings in rooms 1, 2, 10, 10A, 9 and 9A in 711-1N.…
CM 4333- Re-insulate piping on water heater in 704-4N Mens bathroom.…
713-N Repair water damage.…
Painting the exterior of Building 701-1L.…
735-B Stairwell 601 repair fire barrier penetration.…
Installation of Wi-Fi in 782-3A.…
Install WiFi in 784-7A.…
Replacement of the 13.8kV/480V Transformer and 480V switchgear at 152-1K Transformer is warranted as a result of aging issues.…
A valve has been temporarily replaced with pipe blanks.…