This EEC covers the installation of tritium signs at 711-1N, 711-2N, 711-9N, 704-4N, 725-1N, 713-1N--1st floor, 713-1N--2nd floor, 717-10N, 717-8N,…
The failed roofing systems on the Assembly/910/911 roofs of 105-L will be demolished and replaced. This will prevent the numerous leaks that curren…
Pole K1225 needs to be replaced, and pole 37 needs repairs.…
The roof to the 294-H CAEX tunnel needs to be replaced due to age of structure.…
Fabricate and Install Replacement Trash Racks at 681-3G River Pump House.…
Renovation of the men's (Room E-62) and women's (E-61) restrooms in the Centerra-SRS Training Building 703-1B.…
The SRNL Analytical Development uses laboratory module 139 for development of sensors to detect and support hydrogen research. Opportunities to exp…
The Analytical Development group uses Agilent 5900 Inductively Coupled Plasma Emission Spectrometers (ICPES) to perform elemental analysis on both …
The existing control panel at Building 323-M needs to be updated.…
With the developing construction of the Surplus Plutonium Disposition (SPD) Project, two fabric tension structures (Quonset hut), enclosure fencing…