Install WIFI at 735-2B.…
703-5B Install WI-FI.…
Install new lighting to the collaboration room, room 213 at 730-2B.…
Relocate and demolish trailer 704-15B.…
Remove space savers in Room 1001A at 730-4B per Acknowledgement of Scope.…
703-47A Replace (4) doors.…
Provide Power to Buildings 706-H, 706-8H and 706-6H.…
The proposed work activity is to replace the fan belts, bearings, and sheaves due to high vibrations on the two E5 fans in Building 292-2F.…
Replace the exterior double doors located on the eastside of building 704-3N.…
Roof Repairs at 713-N.…